Validation

The library's code was extracted from six open analysis projects by the same author (MIT licence). To make sure nothing changed on the way, validation/parity.py runs each source project's own functions and the library on the same inputs and compares the results number by number. Inputs are public data (NREL PVDAQ, the Kelmarsh, Penmanshiel and Hill of Towie wind farms) or the source projects' synthetic plants.

Source project What the library took from it
pv-budget-bridge PR family, contract availability and PR tests, energy bridge, input schema and DST handling
pv-outage-classifier treatment of event classes (unavailable, excluded, available) in PV availability, long-format conventions
wind-downtime-availability IEC 61400-26 categories, contract presets, time and energy availability
wind-power-curve-kelmarsh air density, normalisation, method of bins, AEP
wind-om-reliability operating time, MTBF and MTTR, Crow-AMSAA, Laplace test, interval operations
bess-ops-warranty SoC-corrected RTE, LTSA availability, rainflow and cycles, capacity tests, damages

Results

41 checks over 989 293 values; the largest relative difference is \(1.3 \cdot 10^{-13}\), in the Shapley bars of the energy bridge, where the library computes the residual factor in a different but equivalent order. Everything else is identical to the last bit.

Source project Check Values compared Largest relative difference
pv-budget-bridge pl_demo: monthly PR, PR_25, PR_wc 144 0 (identical)
pv-budget-bridge pl_demo: bridge bars, sequential (kWh) 480 0 (identical)
pv-budget-bridge pl_demo: bridge bars, Shapley (kWh) 480 1.8e-14
pv-budget-bridge pl_demo: contract availability, time and energy 8 0 (identical)
pv-budget-bridge pl_demo: availability damages and bonus 8 0 (identical)
pv-budget-bridge pl_demo: PR test, measured PR_wc and effective guarantee 8 0 (identical)
pv-budget-bridge pl_demo: PR test damages 4 0 (identical)
pv-budget-bridge pvdaq_34: monthly PR, PR_25, PR_wc 111 0 (identical)
pv-budget-bridge pvdaq_34: bridge bars, sequential (kWh) 360 0 (identical)
pv-budget-bridge pvdaq_34: bridge bars, Shapley (kWh) 360 1.3e-13
pv-budget-bridge pvdaq_34: contract availability, time and energy 6 0 (identical)
pv-budget-bridge pvdaq_34: availability damages and bonus 7 1.7e-16
pv-budget-bridge pvdaq_34: PR test, measured PR_wc and effective guarantee 7 0 (identical)
pv-budget-bridge pvdaq_34: PR test damages 3 0 (identical)
wind-downtime-availability time, energy availability and lost energy from category totals 1,974 5.5e-16
wind-downtime-availability time availability vs the published turbine-year table 658 1.2e-16
bess-ops-warranty RTE windows by local day (energy, dE, RTE with and without aux, EFC, valid) 5,840 0 (identical)
bess-ops-warranty RTE windows by month (energy, dE, RTE with and without aux, EFC, valid) 192 0 (identical)
bess-ops-warranty RTE windows by contract year (energy, dE, RTE with and without aux, EFC, valid) 16 0 (identical)
bess-ops-warranty one-way efficiency auto 1 0 (identical)
bess-ops-warranty measured availability per interval 70,080 0 (identical)
bess-ops-warranty LTSA availability per month 168 0 (identical)
bess-ops-warranty LTSA availability per year 14 0 (identical)
bess-ops-warranty rainflow cycles, hysteresis 0.0 63,955 0 (identical)
bess-ops-warranty rainflow EFC and depth histogram, hysteresis 0.0 15 0 (identical)
bess-ops-warranty rainflow cycles, hysteresis 0.01 8,795 0 (identical)
bess-ops-warranty rainflow EFC and depth histogram, hysteresis 0.01 15 0 (identical)
bess-ops-warranty throughput per interval, discharge_meter 70,080 0 (identical)
bess-ops-warranty throughput per interval, half_throughput_meter 70,080 0 (identical)
bess-ops-warranty throughput per interval, discharge_dc 70,080 0 (identical)
bess-ops-warranty capacity tests (4): energy, correction, uncertainty, margin 24 0 (identical)
bess-ops-warranty guaranteed retention at equivalent age 4 0 (identical)
wind-power-curve-kelmarsh air density, Kelmarsh 2020 (all records) 311,918 0 (identical)
wind-power-curve-kelmarsh normalised wind speed 311,918 0 (identical)
wind-power-curve-kelmarsh bins (ws, power, std, n, u_A) per turbine 1,165 0 (identical)
wind-power-curve-kelmarsh AEP for Rayleigh 5, 6.5, 8 m/s per turbine (MWh) 18 0 (identical)
wind-om-reliability operating hours per turbine 6 0 (identical)
wind-om-reliability MTBF, CI, MTTR, TTR by turbine_id 54 0 (identical)
wind-om-reliability MTBF, CI, MTTR, TTR by component 117 0 (identical)
wind-om-reliability Crow-AMSAA beta, bounds, lambda, LR p, Laplace (fleet, turbines, components) 119 0 (identical)
wind-om-reliability fleet Crow-AMSAA beta vs the published table 1 0 (identical)

pv-outage-classifier is not compared number by number: its availability works on the event objects of its own detector, while the library takes the same information as masks of running, excluded and planned intervals.

What the extraction found

  • Shapley bridge in near-total outages. When the measured losses leave almost no production (less than 5 % of the potential), pv-budget-bridge falls back to its model's potential, and its Shapley bars then no longer add up to the difference between budget and actual. A property test (Hypothesis) found the case in the library's first version; the library now takes the residual factor as whatever the other factors leave unexplained, so both methods close exactly in every month. The sequential bars, which pv-budget-bridge reports by default, were never affected.
  • Trend tests with few failures. wind-om-reliability returns no Laplace statistic for groups with fewer than three failures; the library first did, then was aligned with it (neither a fit nor a trend test means much there).

Running it

Each check runs in the Python environment of its source project, which has that project's dependencies, and reads that project's data folder:

python validation/parity.py pv          --source ../pv-budget-bridge --data ../pv-budget-bridge/data
python validation/parity.py wind-avail  --source ../wind-downtime-availability
python validation/parity.py power-curve --source ../wind-power-curve-kelmarsh
python validation/parity.py reliability --source ../wind-om-reliability --data ../wind-power-curve-kelmarsh/data
python validation/parity.py bess        --source ../bess-ops-warranty

The script exits with an error when any relative difference exceeds \(10^{-9}\) or a missing value appears on one side only.